Earlier in the week after the additional snow fall crews graded periphery roads around the firehall, main street entering town, elevator road, and 4th Street SE.

2nd crew was removing piles near Venture Parts in order to widen to roadway; afterwards their attention was moved to the large pile near the Club Alouette.

Thursday morning the grader addressed main street prior to traffic, and then moved on to other areas of town.

Tomorrow crews will continue grading after 8am. Their focus will be the areas below, in the order that they are written. Although the entirety may not be addressed tomorrow, this is the ultimate goal:

2nd Street SE from 1st Ave SE to 4th Ave SE

Central Ave East

1st Ave SE from main Street to 2nd street SE

1st Ave sw

2nd Ave sw

3rd ave sw

1st Street sw

Monday additional grading crews will be in Town addressing areas listed above that did not receive attention over the weekend. Afterwards, grading crews will then move to 4th Ave SW followed by Labbe Crescent. Additional contract grading crews will be assisting, as such we continue to ask for your patience as we conduct follow-up cleaning to windrows and driveways etc.

Crews will then focus on alleyways that have not been addressed yet after the most recent snowfall.

 

FR

Plus tôt dans la semaine, après les précipitations supplémentaires, les équipes ont nivelé les routes périphériques autour de la caserne des pompiers, la rue principale menant à l’entrée de la ville, la route menant à l’élévateur et la 4e rue SE.

Une deuxième équipe a retiré les tas de neige près de Venture Parts afin d’élargir la route, puis s’est concentrée sur le tas de neige près du Club Alouette.

Jeudi matin, la niveleuse s’est occupée de la rue principale avant l’arrivée du trafic, puis s’est déplacée vers d’autres quartiers de la ville.

Demain, les équipes poursuivront le nivellement après 8 h. Elles se concentreront sur les zones ci-dessous, dans l’ordre indiqué. Même si tout ne pourra peut-être pas être traité demain, voici l’objectif final :

2e rue SE, de la 1re avenue SE à la 4e avenue SE

Avenue Central East

1re avenue SE, de la rue principale à la 2e rue SE

1re avenue SW

2e avenue SW

3e avenue SW

1re rue SW

Lundi, des équipes supplémentaires de nivellement seront en ville pour s’occuper des zones énumérées ci-dessus qui n’ont pas été traitées pendant le fin de semaine. Ensuite, les équipes de nivellement se déplaceront vers la 4e avenue SW, puis vers Labbe Crescent. Des équipes de nivellement supplémentaires sous contrat viendront prêter main-forte. Nous vous demandons donc de continuer à faire preuve de patience pendant que nous effectuons le nettoyage des andains, des allées, etc.

Les équipes se concentreront ensuite sur les ruelles qui n’ont pas encore été traitées après les dernières chutes de neige.

Feb 27 2026 PM Update

Today crews finished cleanup of snow piles along 3rd Street SE to widen the roadway.

Priority routes have been assessed and crews will be addressing other areas.

Through the weekend crews will be clearing access to fire hydrants after recent grading operations.

2nd Ave SE & 3rd Ave SE will see snow removal early next week in order to widen the road way.

Tuesday morning the Main Street business core will be graded (Railway to 3rd Ave) as such, we ask that businesses please clear their sidewalks prior to Tuesday morning in order to have this snow effectively removed by Town crews.

 

27 fév. 2026 – Après midi

Aujourd’hui, les équipes ont terminé le ramassage des tas de neige le long de la 3e rue SE afin d’élargir la route.

Les routes prioritaires ont été évaluées et les équipes s’occuperont d’autres zones.

Au cours du fin de semaine, les équipes dégageront l’accès aux bouches d’incendie après les récents travaux de nivellement.

La 2e avenue SE et la 3e avenue SE seront nettoyées de la neige au début de la semaine prochaine afin d’élargir la route.

Mardi matin, le rue principale au long du centre commercial sera nivelé (de Railway à la 3e avenue). Nous demandons donc aux magasins de dégager leurs trottoirs avant mardi matin afin que les équipes municipales puissent efficacement enlever la neige.

——

February 18 Update

On Friday February 13th, the Town of Falher Grader was sidelined due to mechanical issues. However, repairs are on track to be completed today. Grader operations will resume with a focus on the West side of Town. As such, please avoid street parking in these areas for the next few days. When additional contracted grader assistance is available, they will be brought in to assist with road clearing efforts.

The snow piled in the center of Main Street will be picked up tomorrow.

As always, please remove your garbage cans from the street as soon as possible tomorrow in order to assist with municipal efforts.

Finally, we thank you all for your efforts last week with parking arrangements, garbage can removals, and patience & understanding with our efforts.

 

18 février

Le vendredi 13 février, la niveleuse de la ville de Falher a été mise hors service en raison de problèmes mécaniques. Cependant, les réparations devraient être terminées aujourd’hui. Les opérations de nivellement reprendront en priorité dans la partie ouest de la ville. Par conséquent, veuillez éviter de vous garer dans ces zones pendant les prochains jours. Lorsque des niveleuses supplémentaires seront disponibles, elles seront mises à contribution pour aider au déneigement des routes.

La neige accumulée au centre de Main Street sera ramassée demain.

Comme toujours, veuillez retirer vos poubelles de la rue dès que possible demain afin de faciliter le travail des services municipaux.

Enfin, nous vous remercions tous pour vos efforts la semaine dernière en matière de stationnement, de retrait des poubelles, ainsi que pour votre patience et votre compréhension à l’égard de nos efforts.


 

February 12 Afternoon Update

Crews are finalizing snow pile removal on 2nd Ave SE to create space on the roadway for graded materials that will be lifted while minimizing the narrowing of traffic lanes.

Additionally, grader crews are beginning this afternoon and will continue into the early evening. Today’s plan for grading includes Central Ave and 1st Ave and following school hours grading will move to priority routes:

-Main Street from Hwy 49 to 3rd Avenue; 3rd Avenue East to 2nd Street East; 2nd Street East from 3rd Avenue to Central Avenue; 1st Avenue South from 1st Street East to 4th Street East. (Routhier Bus Lane + Access)

-2nd Avenue SE from 2nd Street to 3rd Street SE (École Héritage Bus Lane); Railway Avenue SE from Main Street to 4th Street SE.

-9th Avenue SW

Additional assistance from contract crews will be in Town on Friday February 13, 2026 to assist with grading operations. As contracted graders do not have wings equipped on their graders, citizens can expect significant windrows. We will have additional equipment following the graders to clear windrows from driveways and property access. With this equipment and procedure change we appreciate your patience as we address our road safety.

To everyone’s continued efforts to refrain from parking on the street, THANK YOU.

Fr

Mise à jour de l’après-midi du 12 février

Les équipes terminent le déneigement de la 2e avenue SE afin de créer de l’espace sur la route pour les matériaux qui seront soulevés tout en réduisant au minimum le rétrécissement des voies de circulation.

De plus, les équipes de gradage commenceront cet après-midi et continueront jusqu’en début de soirée. Le plan de déneigement d’aujourd’hui comprend Central Ave et 1st Ave. Après les heures de classe, le déneigement se poursuivra sur les routes prioritaires :

-Main Street, de HWY 49 à 3 Ave ; 3 Ave Est à 2 St Est ; 2 St Est, de 3 Ave à Central Ave ; 1 Ave Sud, de 1 St Est à 4 St Est. (Voie de bus Routhier + accès)

– 2 Ave SE, de 2 St à 3 St SE (voie réservée aux autobus de l’École Héritage) ; Railway Ave SE, de Main Street à 4 St SE.

– 9 Ave SW

Des équipes supplémentaires sous contrat seront présentes en ville le vendredi 13 février 2026 pour aider aux opérations de déneigement. Comme les déneigeuses sous contrat ne sont pas équipées d’ailes, les citoyens peuvent s’attendre à des tas de neige considérables. Nous disposerons d’équipements supplémentaires qui suivront les niveleuses afin de dégager les tas de neiges de les entrée  et des accès aux propriétés. Nous vous remercions de votre patience pendant que nous nous occupons de la sécurité routière grâce à ces équipements et à ce changement de procédure.

Un gros MERCI à tout le monde pour ses efforts continus afin de ne pas se garer dans la rue.

 

_________________________________________________________________________________________________________________________________

Feb 10th

 

To everyone that has reached out with concerns regarding road conditions, please know that we’ve heard you, we appreciate your input, and our crews continue to do their best to deal with the abnormal conditions of this season. We appreciate all of the patience and community support provided to date, and moving forward.

To provide an update, last week during the teacher’s convention our crews focused on the road areas and snow piles around the schools. Later in the week, roads were graded to reduce the amount of snow/ice material on the roadway. With this week’s warmer weather, crews are focusing on the slippery conditions and removing snow and ice material to get closer to the road surface. You will see crews sanding intersections and utilizing the ice breaker to create traction as well to assist with the removal efforts that are scheduled for later in the week.

How can residents help?

At this time, we ask that residents avoid street parking for the remainder of the week so that crews can access the greatest amount of road surface possible.

Additionally, crews plan to be grading on Thursday as it will be the warmest day of the week. Thursday also happens to be garbage day. With that in mind, we are asking that you bring in your cans as soon as possible after garbage pickup.

Any assistance is greatly appreciated.

Thank you.

 

À tous ceux qui nous ont fait part de leurs préoccupations concernant l’état des routes, sachez que nous vous avons entendus, que nous apprécions vos commentaires et que nos équipes continuent de faire de leur mieux pour faire face aux conditions anormales de cette saison. Nous apprécions toute la patience et le soutien de la communauté dont vous avez fait preuve jusqu’à présent et que vous continuez de nous apporter.

Pour vous tenir au courant, la semaine dernière, pendant le congrès des enseignants, nos équipes se sont concentrées sur les routes et les bancs de neige autour des écoles. Plus tard dans la semaine, les routes ont été nettoyées afin de réduire la quantité de neige et de glace sur la surface routière. Avec le réchauffement des températures cette semaine, les équipes se concentrent sur les conditions glissantes et enlèvent la neige et la glace afin de se rapprocher de la surface de la route. Vous verrez les équipes sabler les intersections et utiliser des brise-glaces afin de créer de l’adhérence et faciliter les efforts de déneigement prévus plus tard dans la semaine.

Comment les résidents peuvent-ils aider ?

Pour l’instant, nous demandons aux résidents d’éviter de se garer dans la rue pendant le reste de la semaine afin que les équipes puissent accéder à la plus grande partie possible de la chaussée.

De plus, les équipes prévoient de niveler les routes jeudi, car ce sera la journée la plus chaude de la semaine. Jeudi est également le jour du ramassage des poubelles. Dans cette optique, nous vous demandons de rentrer vos poubelles dès que possible après le ramassage.

Toute aide sera grandement appréciée.

Merci.